                THE KPEP HYDROELECTRIC DEVELOPMENT
Location: A small village called Kpep on Katsina- Ala River, in the North-West Region.
Technical aspect: construction of a hydroelectric dam of 475 MW combined with a hydroelectric power station, besides various other socio-econo- mic infrastructures for the local populations.
Project cost: CFA F 500 billion by British Group Joule Africa, which is called to carry out the pro- ject in accordance with the BOT (Build-Operate- Transfer) pattern.
THE MENCHUM HYDROELECTRIC DEVELOPMENT
Location: Menchum River in the North-West Region.
Technical aspect: Construction of a hydroelectric development and a 72-MW electrical produc- tion station by Chinese contractor CWE.
Funding: A funding request by the government to Eximbank, China.
THE HYDROELECTRIC DEVELOPMENT OF BANI AT WARAK
Location: Warak, Bini River in the Adamawa Region.
Technical aspect: hydroelectric dam with a 75- MW power production station at its toe, and a 225-Kv energy outgoing power line.
Project cost: Financial structuring in progress in the search of a funding.
THE SONG-DONG HYDROELECTRIC DEVELOPMENT
Location: Song-Dong on the Sanaga River, Sanaga-Maritime Division in the Littoral Region.
Technical aspect: 280-MW hydroelectric deve- lopment and various related constructions so as to supply power in the South Interconnected Network (SIN).
Funding: Funding shopping is being done to Chinese government.
THE GAZ-FIRED TERMINAL STATION OF LIMBE
Location: Limbe, South-West Region.
Technical aspect: Thermal station, working with natural gas and producing electrical power of 315 MW plus a 250-Kv outgoing line.
Current situation: Signing on April 22, 2014 of a draft agreement between the Cameroon government and French company FINAGES- TION Ltd, a partner of the American giant General Electric, for studies, design, funding, construction and operation of the station (Made BOOT). Procedures in order for the achievement are being carried out by the partner.
SONARA PROJECT
Purpose: Extension and modernization of SONARA factory to henceforth refine Cameroon’s heavy crude.
Current situation: Phase I in progress includes expanding production and storage capacities for